We are now well past my "worst case scenario" for dates. I have to say it, Dad, you were right. It'll be almost Christmas before we are in. We were *this* close, and then that roof mixup happened....

On Tuesday, Contractor Man and Union Guy put a couple of big tarps on the roof, so I guess that makes me the proud owner of a really, really big tent. With solid walls.
Hmm, a soft top house? It makes working inside much more pleasant, and keeps the snow out so we can continue to work without a roof, but ya can't live in it.

The mixup with the roofing materials has caused serious problems: the roofer was available in a fairly tight timeframe - and he showed up as scheduled, only to find out that the roofing wasn't what was needed, and of course, we couldn't get replacement roofing that same day. Now that we have the replacement roofing, our roofer is busy on another job. He says he should be available in two weeks.

Yes, I know. Two weeks in December is a long, long time to be in a small shed.

I did look at other options, but they are insanely expensive: a winterized camper van is $100 a night, an ATCO trailer with a furnace is $2200 a month. So, the plan is to snug up the shed a little more. First, we'll get some floor covering down: I have a really nice rag rug type thing that I got at Rona a couple weekends ago for $25. I'm going to spread one of those emergency blankets on the floor and put the rug on top of it, and that should warm up the floor by the beds (there's quite the chill coming from under the beds, so this should solve that problem). Then, on the weekend, I'm going to have to bite the bullet and peel off the paneling and put insulation in the walls. We are just losing too much heat - the kerosene heater can keep the space warm, but we're heating the world as well and need to keep a bit more of it inside if it's gonna be minus 20. Which it is.

Unfortunately, not having a roof on the house delays a lot of other jobs too, but the solar power system is going to be installed (up to the point where moisture-sensitive components arrive) this weekend. Natural gas should be hooked up and metered by the end of this week (it's all hooked up, actually, and Plumber Man has requested an inspection I believe, so we're nearly there). Once that is done we can run the generator off of natural gas, so we'll not have to worry about running out of gasoline.

So, yes, there are delays, and yes, it's disappointing, and yes, it's cold. But you know, I'd rather have these complications and headaches than the kinds of complications and headaches that have been part of my life in the past.

I just got back from a trip to WalMart with long underwear for me and for The Boy, and a few new wool socks. Hot water bottles in bed at night make a world of difference. We'll be all right.